Our Methodology
Five phases, applied in order, adjusted for your floor
Every warehouse is laid out slightly differently and every team carries its own habits. The phases below stay consistent; what changes each time is the specific detail we find once we start looking.
Assess
Every engagement opens with direct observation rather than a questionnaire. We spend time on the floor across different shifts, noting how inventory is received, stored, picked, and shipped in practice. This step exists because the written procedure and the actual process on a busy Thursday afternoon are rarely identical, and the difference between them is usually where the real problem lives.
Map
Observations get translated into a workflow map: a visual trace of how an order moves from arrival to departure, marked with wait times, handoffs, and repeated manual steps. This map is reviewed together with supervisors and, where possible, the staff doing the work, since they often spot the exact point where a process breaks down faster than any outside analysis.
Pilot
Rather than rolling out every recommendation at once, we test one or two changes on a limited scope, such as a single zone, shift, or product category. This keeps disruption contained and gives us a clear, small sample to review before deciding whether to expand a change further.
Roll Out
Once a pilot shows the change holds up under normal conditions, it extends to the wider operation, supported by role-specific training sessions. Rollouts are staged rather than simultaneous wherever possible, so support stays available to whichever team is adjusting to the new step at that moment.
Review
A change that works in week one can drift by month three as order volume shifts or staff turn over. Review check-ins revisit what was implemented, confirm it is still being followed as designed, and flag anything that needs a further small adjustment rather than a fresh overhaul.
On the Floor
Mapping sessions happen where the work happens
Workflow mapping sessions are held on the warehouse floor rather than in a conference room whenever the layout allows it. Standing at the point where a bottleneck actually occurs tends to surface details that get lost in a meeting summary two rooms away. Supervisors and available staff walk the route with us, describing what usually happens rather than what the manual says should happen.
Why pilots come before full rollout
A change that looks reasonable on a diagram can behave differently once real order volume, real staff, and a real busy afternoon are involved. Piloting on a limited scope, a single aisle or a single shift, lets us catch that difference early, while the cost of adjusting course is still small.
It also gives staff a chance to weigh in on a change before it becomes permanent across the whole operation, which tends to produce better feedback than asking for input after the fact.
Want to see how this applies to your floor?
A first conversation helps identify which phase your operation would realistically start from.
Book a Consultation